    LEF QUILT ON WESTON

    MIXED USE AFFORDABLE HOUSING DEVELOPMENT
    1240-1250 Weston Road, Toronto, ON, M6M 4P8

    PREQUALIFICATION OF CONSTRUCTION MANAGERS

    POSTING SUMMARY

    The Learning Enrichment Foundation (LEF) propose to construct a new nineteen-storey building that will have a gross floor area of approximately 12,998 m2, plus two levels of below grade parking, located at the intersection of Weston Road and Somerville Avenue. The work will include site work including new sidewalk,
    driveway and landscaping. The construction value is estimated at $90,000,000. The intent is to enter into a preconstruction services contract for collaborative pre-construction services and undertake an integrated design
    approach with design-assist services provided by the Construction Manager and key subtrades/suppliers and thereafter to enter into a CCDC 5B-2010 Construction Management Contract for the full construction of the
    project. The project is currently in the early stages of the planning approvals process with an anticipated construction start of Q4, 2024.

    Proposals will be invited from the list of pre-qualified Construction Managers only. The pre-qualification process will include an assessment of previous performance in a number of areas, including but not limited to: similar work, pre-construction services, design assist, scheduling, construction management, workmanship, final
    completion, correction of deficiencies and Health and Safety.

    Download full RFQ documents below outlining:
    • Project Summary
    • Project Schedule
    • Description of Pre-Construction Services & Design Assist Services required
    • Submission Requirements
    • Evaluation Criteria

    Pre-qualification submissions shall be submitted to LGA Architectural Partners by email. Provide download link (e.g. drop box) for attachments over 10mb in size.
    Attention: Kevin Martin, kevin@lga-ap.com

    Email Title should be:
    Construction Manager Pre-qualification Submission – LEF Quilt On Weston

    Deadline for submissions: June 8, 2022, 5:00PM Local Time

    Submissions received after closing deadline may not, in LEF’s sole and absolute discretion, be accepted. LEF reserves the right in its sole and absolute discretion to select and pre-qualify only those Construction Managers which LEF deems suitable for this project.

    Direct all enquiries regarding the above to Kevin Martin, kevin@lga-ap.com

    https://ontarioconstructionnews.com/wp-content/uploads/2022/05/A-SUMMARY-LEF-Quilt-On-Weston_Prequalification.pdf

    https://ontarioconstructionnews.com/wp-content/uploads/2022/05/B-DOCUMENT-Request-for-Prequalification.pdf

    How to apply: