Port Hope Jack Burger Sports Complex Pool Side Change Rooms Flooring Replacement

Industry Name: Leisure/Parks/Recreation

Trade Name: Community/Recreation/Senior Centres

Project Street: 60 Highland Dr.

Project City: Port Hope

Detail Of Services: This Invitation to Tender (the “ITT”) is an invitation by the Corporation of the Municipality of Port Hope (the “Municipality”) to prospective bidders to submit bids for Pool Side Change Rooms Flooring Replacement at the Jack Burger Sports Complex, as further described in the ITT Particulars section.

Questions Contact: Procurement Administrator Email: procurement@porthope.ca Question Deadline: April 19, 2024 at 4:30pm

Quinte West Trent Port Marina Breakwater System Supply & Installation

Industry Name: Water/Marine Construction

Trade Name: Docks/Piers/Breakwaters

Project Street: Various/Multiple

Project City: Quinte West

Detail Of Services: Three floating breakwaters at the Trent Port Marina were installed when the marina was built in 2015. These structures were installed to shelter the marina from wave action and are composed of modules, each made of a solid polystyrene core encapsulated in a concrete casing, all connected by timber wales along the longitudinal faces of the breakwater. The wales are tied together with steel tie rods that go through the wale and concrete module to the opposite face. This system holds the modules together to form a continuous breakwater. The breakwaters are anchored in position using chains secured to bedrock on the lake bottom. Several components of the existing breakwater system are failing or have failed. Significant damage and cracking have been observed throughout the breakwater systems causing deterioration of the concrete and polystyrene core. The work included is everything required to design, prepare and produce all submissions identified in the Specifications including but not limited to the wave climate report, design calculations for all components of the breakwaters, functional performance (wave attenuation) calculations, shop drawings, winterization plan, removal of the old floating breakwaters, operation manual, and all closeout documents. The work also includes three meetings with City staff, and training for the City’s staff on the maintenance, operation, and winterization of the floating breakwater system. Payment will be made at the lump sum price indicated in the Schedule of Quantities and Unit Prices. Compensation shall be for all materials, equipment and labour to complete the work. For progress payment, 75% of the lump sum will be paid upon submission of satisfactory all submissions excluding the operation manual and other closeout documents. The balance will be paid upon satisfactory submission of the operation manual, closeout documents, and completion of staff training. Refer to all Sections and Performance Specification – Floating Breakwater.

Questions Contact: Questions related to this report are to be submitted to the Project Representative through the Bidding System by clicking on the Submit a Question button associated with this opportunity. Question Deadline: April 24, 2024 at 12:00pm Procedural Contact Email: purchasing@quintewest.ca

Cornwall Boundary Road Lighting Improvements

Industry Name: Outdoor Light/Power

Trade Name: Street/Roadway/Parking Lot Lighting

Project Street: Boundary Road

Project City: Cornwall

Detail Of Services: The work for the project involves: The construction of new roadway lighting on Boundary Rd. between Industrial Park Dr. and SCM Way (Sta. 0 000 to 0 600). The scope of work includes the new installation of an electrical service system (service connections, power cable & conduit, electrical service enclosure assemblies, etc.), underground roadway lighting cable & conduit, roadway light assembly locations (base mounted aluminum poles, concrete base, aluminum elliptical brackets, LED light fixtures, photocells, riser cable, restoration / reinstatement, etc.) and the removal of existing roadway light locations.

Questions Contact: Purchasing Services Phone: (613)932-6252 Email: purchasing@cornwall.ca Questions Deadline: Wed Apr 17, 2024 4:30 PM (EDT)

Northern Ontario

Greater Sudbury Landfill Site West & South Perimeter Roads Consulting Services

Industry Name: Heavy/Highway/Utilities

Trade Name: Highway/Roadwork

Project Street: Various/Multiple

Project City: Sudbury

Detail Of Services: Request for Proposal (RFP) for Detailed Design, Contract Administration, and Inspection for Engineering Consulting Services of the West and South Perimeter Roads at the Sudbury Landfill Site Refer to the Bid Solicitation Document for all details, timelines and/or conditions, if applicable, regarding this procurement.

Questions Contact: Questions related to this report are to be submitted to the Project Representative through the Bidding System by clicking on the Submit a Question button associated with this opportunity. Question Deadline: Wed Apr 24, 2024 11:59:00 PM (EDT)

Southern Ontario

St. Thomas Pollution Control Plant Optimization Upgrades & Aerated Sludge Tanks

Industry Name: Industrial

Trade Name: Pollution Control Facilities/Plants

Project Street: 40359 Bush Line

Project City: St. Thomas

Detail Of Services: Construction of aerated sludge storage tanks and associated equipment to replace existing infrastructure.

Questions Contact: Questions related to this report are to be submitted to the Project Representative through the Bidding System by clicking on the Submit a Question button associated with this opportunity. Question Deadline: April 18, 2024 at 4:30pm

TDSB Sir Wilfrid Laurier CI Native Learning Centre East Expansion Professional Services

Industry Name: Educational

Trade Name: Schools

Project Street: 145 Guildwood Pkwy

Project City: Scarborough

Detail Of Services: Professional Services, Program Expansion at Sir Wilfrid Laurier CI – Native Learning Centre East

Questions Contact: Questions related to this report are to be submitted to the Project Representative through the Bidding System by clicking on the Submit a Question button associated with this opportunity. Question Deadline: April 15, 2024 at 12:00pm

TCH Alexandra Park Phase 2A Site 3 & 16 Waterproofing

Industry Name: Residential

Trade Name: Social Housing/Public Housing

Project Street: Various/Multiple

Project City: Toronto

Detail Of Services: From 2013-2019 TCHC worked with their development partner, Tridel, to complete Phase 1 of the revitalization. In 2020, TCHC has again partnered with Tridel for Phase 2 of the revitalization which concerns the remainder of the lands at Alexandra Park. Phase 2A, the next sub-phase of development, is currently underway. TCHC is seeking to deliver a Passive House pilot project as part of the revitalization of the Alexandra Park community in Toronto. The project comprises of twenty-one townhouses. Five of the townhouses are through-units (Site 3) and sixteen of the townhouses are back-to-back units (Site 16). The design is targeting Passive House Institute US (PHIUS+) 2018 certification. We are expecting to commence construction in Q1 of 2024 and finish construction in early 2025. The pilot project is subset of a larger phase of development known as Phase 2A where Deltera Contracting Inc. is the Construction Manager for TCHC. Toronto Community Housing Corporation (TCHC) is seeking a Contractor for the provision of Waterproofing work at Alexandra Park Phase 2A Site 3 & 16. TCHC will be awarding the Project to the highest, final, ranking Proposal.

Questions Contact: TCH Procurement Department Email: tchprocurement@torontohousing.ca

 